MC 30 Cut Back Bitumen
Essential Details Description
Type Cut Back Bitumen
Feed Stock Penetration Bitumen and Petroleum Solvent
HS Code 27150090
Inspection Included
Delivery Term FOB-CFR-CIF 
Production and Loading Period Approximately 1 Month
Payment Term TT Method 
FOB Delivery: 30% advance and balance against customs documents
CFR/CIF Delivery: 30% advance and balance against B/L draft
Marking Marking can be customized based on customer request
Supply Capacity 1000 MT/Month
Packing Reconditioned Steel Drum

Bitumen MC 30 Specification

Cutback Bitumen Medium-Curing-30 Specifications
Properties Specification Limit Test Method
Min Max
Kinematic Viscosity at 60 °C ,cSt 30 60 ASTM D2170
Flash Point (Top Open Cup), °C 38 ASTM D3143
Distillate, %Volume of Total Distillate to @360 °C
To 225 °C 35 ASTM D402
To 260 °C 40 70
To 316 °C 75 93
Residue From Distillation to 360 °C (% Vol by Difference) 50
Test on Residue From Distillation Test
Penetration, 25 °C, (dmm) 120 300 ASTM D5
Ductility, 25 °C, (cm) 100 ASTM D113
Water Content (% Vol) 0.2 ASTM D95

Bitumen MC30 Packing

Type Picture Description
Reconditioned Drum

Net Weight: 180 kg
Gross Weight: 203 kg
Empty Drum Weight: 23 kg
Number of Drums per Container: 80 Drums in 20-foot Container